Method For Preparation Of Dry Soil Samples For Various Tests

✓
Written by Help The Engineer Team
Reviewed by Er. Inderjit Sharma (Retd.), Punjab PWD

Why prepare soil samples? Soil brought from the site is wet, lumpy and mixed with roots and stones. Before any lab test (water content, liquid limit, CBR, compaction and so on), it must be dried, cleaned, broken down, sieved and reduced to the right quantity.

If the sample is not prepared properly, the test results will be wrong. This guide follows IS 2720 (Part 1): Preparation of Dry Soil Samples for Various Tests.

The Process at a Glance

1. Field samplewet, lumpy soil 2. Dryair / sun / oven 3. Cleanremove roots, stones 4. Break clodswooden mallet 5. Pulverizemortar & rubber pestle 6. Sieveas per the test 7. Mix & dividequartering / riffle 8. Test sampleready for the lab
Fig. 1: The 8 steps of preparing a dry soil sample for laboratory tests.

Apparatus Required

Wooden mallet

To break soil lumps (clods) without crushing the grains.

Trays

Non-rusting trays to spread and dry the soil.

Mortar & rubber pestle

Rubber-covered pestle breaks lumps but not the soil grains.

Riffle sampler

Splits a sample into two equal halves quickly and fairly.

110°C

Oven (up to 250°C)

Thermostatically controlled; soil is dried at 105–110°C.

500.0g

Balances

500 g (0.01 g), 10 kg (0.5 g) and 15 kg (1 g) capacity.

Step-by-Step Procedure

  1. Dry the sample. Spread the soil in a tray and let it air-dry or sun-dry. In wet weather a drying apparatus may be used, but the temperature must not exceed 60°C. If an oven is used, do not exceed 110°C.
  2. Remove unwanted material. Pick out roots, bark, leaves and other organic matter, and non-soil items such as shells or pieces of brick.
  3. Break the big lumps. Use the wooden mallet to break clods. This also helps the soil dry faster.
  4. Cool the soil. After drying, let it cool down to room temperature.
  5. Pulverize. Break the remaining lumps in the mortar with a rubber-covered pestle, until the soil passes the sieve needed for the test (see table below). Do not crush the individual soil grains.
  6. Mix well. Mix the soil thoroughly and spread it on a clean, flat surface.
  7. Reduce to the required quantity. Use a riffle sampler or the quartering method until you have the amount needed for the test.

Drying Temperature Guide

Air / sun dryingroom temp. max 60°C Drying apparatus (wet weather) Organic or calcareous soils 105–110°C Oven drying (max 110°C)
Fig. 2: Never dry soil hotter than these limits. Soils with organic matter or lime (calcareous) must not go above 60°C.

Sample Quantity and Sieve for Each Test

TestDryingSample quantityPass through sieve
Water contentOven, 105–110°C, 24 h25 g to 1 kg, depending on particle size (see below)–
Liquid limitAir or oven, 105–110°C, 24 h120 g425 micron
Plastic limitAir or oven, 105–110°C, 24 h20 g425 micron
Free swell indexAir or oven, 105–110°C, 24 h20 g425 micron
Specific gravityAir or oven, 105–110°C, 24 h50 g (fine soil) / 400 g (medium & coarse soil)2 mm
Compaction (Proctor)Air or oven, 105–110°C, 24 h6 kg (not easily crushed) / 15 kg (easily crushed)19 mm
CBRAir or oven, 105–110°C, 24 h15 kg19 mm
Grain size analysisAir or oven, 105–110°C, 24 hDepends on largest particle size; see IS 2720 (Part 4)–

Water Content: How Much Sample?

The bigger the soil particles, the more sample you need:

Size of particles (90% passing)Minimum sample
425 micron25 g
2 mm50 g
4.75 mm200 g
9.5 mm300 g
19 mm500 g
37.5 mm1 kg

How to Divide the Sample: Quartering

A large heap of soil is reduced to a smaller, fair sample by quartering. Repeat it until you get the required quantity.

1. Mix welland heap it 2. Flatteninto a round layer ABCD3. Divide in 4equal quarters AD4. Keep A + D(opposite quarters) Repeat steps 1–4 until you have the quantity you need
Fig. 3: Quartering. Keep two opposite quarters (A and D), remove the other two, and repeat.

Quartering with a Cloth (No Splitter Available)

  1. Pour the sample onto a quartering cloth and level it with a rod.
  2. Slide the rod under the middle of the cloth and lift both ends of the cloth, so the soil divides into two equal halves.
  3. Repeat at right angles to make four quarters.
  4. Keep two diagonally opposite quarters. If the sample is still too large, repeat with the retained part.

Practical Tips for Site Engineers

Good lab results start with a good sample from the site. Use these practical methods when collecting and preparing soil in the field.

1. Collecting the Sample from a Trial Pit

Bag 1Layer 1 Bag 2Layer 2 Topsoil: remove 150–300 mm (don’t sample) Layer 1: sandy soil Layer 2: clayey soil Sample each soil layer separately and label each bag
Fig. 4: Remove the topsoil, then take a separate sample from each soil layer into its own labelled bag.

⛏️ Skip the topsoil

Remove the top 150–300 mm with roots and grass. Topsoil is organic and is never used for testing or filling.

🎨 One layer, one bag

If the soil colour or type changes with depth, take a separate sample from each layer. Never mix different soils in one bag.

⚖️ Take enough soil

Compaction + CBR alone need up to 30 kg. Collect about 40–50 kg per location so tests can be repeated if needed.

💧 Natural moisture sample

For field moisture content, put a small sample in an airtight jar or sealed polythene bag at once, so it does not dry out on the way.

2. Drying Soil on Site (No Oven Available)

  1. Spread the soil in a thin layer (about 2–3 cm) on a clean tarpaulin or polythene sheet in the sun.
  2. Break big lumps with a wooden mallet or the back of a shovel, and turn the soil every hour so it dries evenly.
  3. Do not dry soil on hot iron sheets or over a fire. The heat can burn organic matter and change clay properties.
  4. Cover the soil if rain is expected, and bring it under shelter in the evening so it does not absorb dew.

3. Dividing a Large Sample on Site

No riffle box on site? Pour the soil on a clean tarpaulin, mix it well with a shovel, flatten it into a round heap, mark a “+” with the shovel edge, and keep two opposite quarters (same as Fig. 3). For gravelly soil, flatten the heap instead of making a cone, so the big stones don’t roll to the sides.

4. Labelling and Sending to the Lab

🏷️ Write on every bag (inside and outside):
  • Name of work / project and chainage or location
  • Pit number and depth (e.g. 0.3–1.0 m)
  • Soil description (colour, type) and tests required
  • Date of sampling and name of the engineer

Use strong double bags (polythene inside a gunny bag), and keep a sample register on site with the same details.

5. Avoid These Common Mistakes

❌ Contamination

Keep samples away from cement, lime, ash, oil and construction debris.

❌ Surface-only samples

Samples scraped from the surface or a spoil heap do not represent the ground below.

❌ Mixed or unlabelled bags

One wrong label can lead to the wrong design. Label at the pit, not later.

Precautions

🚫 Don’t crush grains

Only break the lumps. Crushing the soil grains changes the test results.

🌡️ Watch the temperature

Soils with organic matter or lime must not be dried above 60°C.

⛰️ No cone for gravel

Do not quarter coarse gravel or gravelly soil by forming a cone; the big stones roll to the edges and the sample becomes uneven.

🏷️ Label everything

Mark each tray with the sample number, location, depth and date to avoid mix-ups.

Key Takeaways

  • Prepare soil in this order: dry → clean → break → pulverize → sieve → mix → divide.
  • Oven drying: 105–110°C (never above 110°C). Organic or calcareous soils: max 60°C.
  • Use a wooden mallet and a rubber-covered pestle so grains are not crushed.
  • Use a riffle sampler or quartering to get a fair, smaller sample.
  • Take the right quantity and sieve for each test (e.g. LL 120 g through 425 micron; CBR 15 kg through 19 mm).
  • On site: skip the topsoil, sample each layer separately, collect 40–50 kg, seal moisture samples, and label every bag at the pit.

References: IS 2720 (Part 1): Methods of Test for Soils – Preparation of Dry Soil Samples for Various Tests; IS 2720 (Part 2): Determination of Water Content.