Determination Of Penetration Value of Bitumen

✓
Written by Help The Engineer Team
Reviewed by Er. Inderjit Sharma (Retd.), Punjab PWD

What is the penetration test? It measures how hard or soft bitumen is. A standard needle carrying 100 g is allowed to sink into bitumen at 25 °C for 5 seconds. The depth is measured in units of 0.1 mm.

Higher penetration = softer bitumen. A penetration of 65 means the needle went 6.5 mm deep.

This guide follows IS 1203.

Soft vs Hard Bitumen

3.5 mmHard bitumen: penetration 359 mmSoft bitumen: penetration 90Same needle, 100 g, 5 seconds, 25 °C
Fig. 1: The needle sinks further into soft bitumen. Penetration is the depth in tenths of a millimetre.

The Penetrometer

Dialreads in 0.1 mm Weighttotal moving load 100 g Standard needle Bitumen sample Transfer dishwater at 25 °C Release button5 seconds
Fig. 2: The penetrometer. The needle assembly (total 100 g) is released for exactly 5 seconds and the dial shows how far it sinks.

Apparatus Required

Penetrometer

Holds the needle; dial reads in 0.1 mm.

Standard needle

Hardened, polished steel; total moving weight 100 g.

55×3570×45

Sample containers

55 × 35 mm (penetration below 225); 70 × 45 mm (225–350).

Water bath (25 ± 0.1 °C)

At least 10 litres; keeps the exact test temperature.

Transfer dish

Keeps the sample under water during the test.

Stopwatch & thermometer

Time exactly 5 seconds; check bath temperature.

Procedure

Step 1: Prepare the Sample

  1. Heat the bitumen gently until it can be poured, not more than 90 °C above its softening point (60 °C for tars). Stir until it is uniform and free of air bubbles and water. Use an air oven or sand bath so the bottom doesn’t overheat.
  2. Pour it into the container to a depth at least 10 mm more than the expected penetration. Cover it against dust.
  3. Let it cool in air (15–30 °C): 1–1.5 hours for the small container (35 mm deep), 1.5–2 hours for the large one (45 mm deep).
  4. Then keep it in the water bath at 25 ± 0.1 °C for the same time.

Step 2: Take Readings

  1. Place the container in the transfer dish, fully covered with water from the bath, on the penetrometer stand.
  2. Clean the needle (with benzene or a suitable solvent) and dry it. Lower it until the tip just touches the bitumen surface (use the reflection to judge).
  3. Set the dial to zero. Release the needle for exactly 5 seconds, then lock it and read the dial.
  4. Take at least three readings, each at least 10 mm apart and 10 mm from the container wall. Clean the needle before each reading.
123 ≥ 10 mm Keep ≥ 10 mmfrom the wall Top view of the sample container
Fig. 3: Take at least three readings, at least 10 mm apart and at least 10 mm from the edge.

Result

Penetration = mean of at least 3 readings (in units of 0.1 mm)

Maximum Allowed Difference Between Readings

PenetrationMax. difference (highest − lowest)
0–492
50–1494
150–2496
250 and above8

If the readings differ by more than this, repeat the test.

Try It: Penetration Calculator

Enter the three dial readings (0.1 mm units). The values filled in are a worked example.

⬇ Download Excel Proforma

Precautions

🌡️ Exactly 25 °C

Penetration changes a lot with temperature. Keep the bath at 25 ± 0.1 °C and test with the sample under water.

📍 Touch, don’t press

The needle tip must just touch the surface at the start. Starting above or pressed into the surface gives a wrong reading.

🧽 Clean, straight needle

Clean and dry the needle before every reading; replace it if it’s bent or damaged.

🚫 Don’t overheat

Overheating while melting hardens the bitumen and lowers penetration. Discard a reading if the container moves.

Practical Tips for Site Engineers

1. Minimum Penetration of Paving Bitumen (IS 73)

GradeMin. penetration at 25 °CTypical use
VG-1080Spraying, cold regions, light traffic
VG-2060Cold and hilly regions
VG-3045Most roads in India; heavy traffic
VG-4035Hot climates, very heavy traffic, junctions

VG grades are specified mainly by viscosity; penetration is one of the other requirements. Follow IS 73 and your contract.

2. Good Site Habits

  1. Test every tanker: a quick penetration test confirms the grade before unloading; compare with the supplier’s certificate.
  2. Too low = overheated or aged: bitumen held too hot for too long in plant tanks hardens and loses penetration, leading to brittle, cracking roads. Watch storage temperatures.
  3. Too high = wrong grade or diluted: unusually soft bitumen may be a softer grade or mixed with oil; it causes rutting and bleeding in summer.
  4. Match grade to climate: harder grades (VG-30, VG-40) resist rutting in hot regions; softer grades suit cold areas.
  5. Keep samples: keep a sealed, labelled sample from each tanker until the work is accepted, for re-testing if problems appear.

Key Takeaways

  • Penetration = depth (0.1 mm) a 100 g needle sinks in 5 seconds at 25 °C; higher means softer.
  • Heat gently, pour, cool in air, then condition in the water bath at 25 ± 0.1 °C.
  • At least 3 readings, 10 mm apart and 10 mm from the edge; check the allowed spread.
  • Minimum penetration: VG-10 80, VG-20 60, VG-30 45, VG-40 35.
  • On site: test every tanker; low values mean overheating or ageing, high values mean the wrong grade or dilution.

References: IS 1203: Methods for Testing Tar and Bituminous Materials – Determination of Penetration; IS 73: Paving Bitumen – Specification; MoRTH Specifications for Road and Bridge Works (Section 500).