Determination Of Ten Percent Fines Value

✓
Written by Help The Engineer Team
Reviewed by Er. Inderjit Sharma (Retd.), Punjab PWD

What is the Ten Percent Fines Value (TFV)? It is the load (in kN) needed to crush the aggregate so that 10% of it turns into fines (passing the 2.36 mm sieve).

Higher TFV = stronger stone. A stone needing 200 kN to make 10% fines is much stronger than one that needs only 60 kN.

Why use it? For weaker aggregates (crushing value above about 30%), the standard crushing test is not sensitive enough; TFV gives a better comparison. This guide follows IS 2386 (Part 4) and BS 812 (Part 111).

The Idea in One Picture

200 kN Strong stoneneeds a big load for 10% finesTFV = 200 kN 60 kN Weak stonea small load already gives 10% finesTFV = 60 kN
Fig. 1: Both samples end up with 10% fines, but the strong stone needed a much bigger load. That load is the TFV.

Apparatus Required

Compression testing machine

Applies a steadily increasing load (up to about 400 kN) in 10 minutes.

Cylinder, plunger & base plate

Hardened steel cylinder, 150 mm inside diameter.

115 × 180 mm

Cylindrical measure

Fixes the amount of sample: 3 layers × 25 tamps.

16 mm Ø × 450–600 mm

Tamping rod

Rounded end; compacts each layer.

Sieves 12.5, 10, 2.36 mm

Prepare the sample and separate the fines after crushing.

2850

Balance (1 g) & oven

Weigh to 1 g; dry at 105–110 °C.

Test Setup

Plunger Steel cylinder150 mm inside Aggregate12.5–10 mm, 3 layers Base plate Load appliedsteadily over 10 min Compression testing machine
Fig. 2: The plunger is pushed into the cylinder of aggregate by the compression machine.

Procedure

  1. Sieve the aggregate and take material passing 12.5 mm and retained on 10 mm (BS 812 uses 14–10 mm). Dry it in the oven at 105–110 °C (or soak it for 24 hours if a soaked TFV is required).
  2. Fill the cylindrical measure (115 × 180 mm) in 3 equal layers, tamping each layer 25 times. Level the top. This sets the sample size; weigh it (m1).
  3. Put the steel cylinder on the base plate and add the sample in 3 layers × 25 tamps. Level the surface and insert the plunger so it sits flat.
  4. Place it in the compression machine. Apply load at a steady rate so the plunger goes down in 10 minutes by about:
    • 15 mm for rounded aggregate (gravel)
    • 20 mm for normal crushed aggregate
    • 24 mm for honeycombed aggregate (some slags)
    Note the maximum load reached (x, kN).
  5. Release the load, take out all the material and sieve it on the 2.36 mm sieve. Weigh the fines passing (m2). Fines % = m2 ÷ m1 × 100.
  6. The fines must be between 7.5% and 12.5%. If not, repeat at an adjusted load. Do two tests at the load that gives fines in this range.
15 mmRounded graveluncrushed 20 mmCrushed stonenormal aggregate 24 mmHoneycombede.g. some slags Target plunger penetration in 10 minutes
Fig. 3: How far the plunger should go down in 10 minutes depends on the type of aggregate.
💡 Tip for the first trial load: if you know the aggregate impact value (AIV), the load for the first test can be estimated as about 4000 ÷ AIV (kN) (BS 812 note). For AIV = 20%, start at about 200 kN.

Calculation

Fines (%) = m2 ÷ m1 × 100
TFV (kN) = 14x ÷ (y + 4)

x = maximum load applied (kN); y = mean percentage fines from the two tests at load x (must be between 7.5% and 12.5%). Report to the nearest whole number (10 kN or more) or to the nearest 0.5 kN below 10 kN.

📝 Worked example

x = 180 kN; fines from two tests = 9.6% and 10.4% → y = 10.0%
TFV = 14 × 180 ÷ (10.0 + 4) = 180 kN

📈 Graph method

The BS method also lets you plot load against % fines for several tests and read the load at 10% fines from the best-fit line.

Try It: TFV Calculator

Enter the maximum load and the weights from two tests at that load. The values filled in are the worked example.

Test 1
Test 2

Precautions

🔩 Plunger must not jam

Check that the plunger moves freely inside the cylinder throughout loading.

⏱️ Steady 10-minute loading

Apply the load evenly so the target penetration is reached in about 10 minutes.

🧹 Don’t lose fines

Empty the cylinder over a clean tray; if m2 + m3 differs from m1 by more than 10 g, repeat the test.

🦺 Safety

Keep hands clear of the platens and use a guard; aggregate can burst out under high load.

Practical Tips for Site Engineers

1. Typical Minimum TFV

UseMinimum TFV
Concrete for wearing surfaces50 kN
Other concrete30 kN
Granular sub-base (soaked, MoRTH)50 kN

Always follow your contract specification.

2. Good Site Habits

  1. Use TFV for weaker material: for soft stone, moorum, laterite or slag, TFV shows differences that the crushing value test misses.
  2. Soaked vs dry: many stones lose strength when wet. A large drop between dry and soaked TFV warns that the material may weaken in the monsoon. Test soaked where specified (e.g. GSB).
  3. Save time with AIV: estimate the first trial load from the impact value (4000 ÷ AIV) to reach the 7.5–12.5% range in fewer trials.
  4. Test at source approval and again when the quarry face or material changes.
  5. Read it with other tests: TFV, AIV, abrasion value, shape and water absorption together decide whether a source is acceptable.

Key Takeaways

  • TFV = load (kN) that produces 10% fines (passing 2.36 mm); higher means stronger.
  • Sample 12.5–10 mm in a 150 mm cylinder, 3 layers × 25 tamps; load so the plunger goes 15/20/24 mm in 10 minutes.
  • Fines must fall between 7.5% and 12.5%; TFV = 14x ÷ (y + 4).
  • Typical minimums: 50 kN for wearing surfaces, 30 kN for other concrete, and 50 kN for soaked GSB.
  • On site: best test for weaker aggregates; compare soaked and dry values; estimate the first load from AIV.

References: IS 2386 (Part 4): Methods of Test for Aggregates – Mechanical Properties; BS 812 (Part 111): Methods for Determination of Ten Per Cent Fines Value; IS 383: Coarse and Fine Aggregate for Concrete; MoRTH Specifications for Road and Bridge Works (Section 400).

Leave a Comment

Your email address will not be published. Required fields are marked *