28.1 (c) iii

Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects. Exceeding 2.25 m depth upto 3.00 m depth For semi conglomerate soil of having gravel/Boulder upto 50%