24.4.b

Compacting original ground below Embankment Loosening, leveling and compacting original ground below embankment to facilitate placement of first layer of embankment, scarified to a depth of  150  mm,  mixed  with  water  at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per technical clause 305 of MORT&H specifications