Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. 30 cm size of pots
Providing cement pots at site of work, filling 2/3rd volume with mixture of good earth and screened manure and cocopeat in the ratio 2:1:1. 30 cm size of pots