Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around:- For hard clayey soil or hard conglomerate or semi-rocky type of the nature of pick- jumper with occasional blasting.
