22.1 C (ii) (a) (iii)

Furnishing and Placing Reinforced/ Prestressed cement concrete in super- structure as per drawing and Technical Specification RCC Grade M 30-For solid slab. Using Batching Plant, Transit Mixer andConcrete Pump For Solid slab super-structure- including centering and shuttering Height above 10m