22.1 A (ii) (a) (i)

Furnishing and Placing Reinforced/ Prestressed cement concrete in super- structure as per drawing and Technical Specification RCC Grade M20 Case I Using Batching Plant, Transit Mixer andConcrete Pump For Solid slab super-structure- including centering and shuttering Height up to 5m