20.5 (c) (i)

Adjusting check plates of open flume outlet to correct ‘B’ and fixing at site flush with the gullet walls :- Extra over item No. 20.5(a) In case of existing outlets where dismantling and reconstructing side walls is involved includingchange of ‘B’ upto 30 mm With ‘H’ upto 0.5 m