10.56 d

Vertical load testing of piles in accordance with IS 2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in- charge. Single pile above 50 tonne and upto 100 tonne capacity Routine test.