Turfing of slopes of new banks with rough grass including prepartion of ground, Supplying and planting doob grass roots at 15 cm. apart, Supplying and spreading manture @ 0.18 cum per 100 sqm.
Turfing of slopes of new banks with rough grass including prepartion of ground, Supplying and planting doob grass roots at 15 cm. apart, Supplying and spreading manture @ 0.18 cum per 100 sqm.