Boring with 100 mm diametre casing pipe for hand pump/ tube well in all soils except ordinary hard rocks requiring blasting including removing the casing pipe after the hand pump/tube well is lowered and tested. Beyond 12 mtr and upto 18 mtr depth.
Boring with 100 mm diametre casing pipe for hand pump/ tube well in all soils except ordinary hard rocks requiring blasting including removing the casing pipe after the hand pump/tube well is lowered and tested. Beyond 12 mtr and upto 18 mtr depth.