Providing and applying Anti Termite Treatment using pre constructional chemical treatment measures as per IS – 6313 – 2001 ( Part 2 ) & using Chemical containing chloropyrifos systemic insecticide diluted to manufacturer’s specifications (i) In foundation pits, by treating the bottom & sides up to height of 300mm by uniformly spraying solution @ 5 Litre / sqm (ii) In the refill earth on both sides of all built up walls @ 7.5 Litre / Running meter (width – 300 mm, depth – 450 mm) (iii) Before laying the floor, by uniformly sprinkling the top surface of the consolidated earth within the outer perimeter @ 5 Litre solution per sqm.
