Skip to content
  • Home
  • Punjab CSR
    • Search CSR 2010
    • Search CSR 2020
  • Publications
    • PWD Publications
      • PWD Specification
      • CSR 2010 & 2020
      • AC Slips 2010 & 2020
      • Premium List
      • Building Safety
      • Plinth Area Rates
    • Water Supply & Sanitation Publications
    • CPWD Publication
    • Civil Engineerings Video’s
    • Drawings
  • Quality Control
  • PWD Engineers
  • Contractor Section
  • Notifications
  • Blog

13.10

Assembling at site and hoisting and placing in position tubular trusses, complete with accessories such as purlins, bracings, longitudinal ties, truss shoes, purlin clips and other truss components complete in all respects.

← Previous CSR DATA
Next CSR DATA →

Recent Posts

  • GoDaddy Hosting Support
  • 5.2.(v).e–test
  • 5.2.(v).f–test

Recent Comments

  • Best SEO Services on Derivation of Area Under Acre to Kanal and Big Marla.
  • Abdul Jaleel P on IRC SPECIFICATIONS, STANDARDS, DESIGN CODES
  • mittal solanki on Different Units Used in Engineering and Revenue Department

Categories

  • Engineer Blog
  • Mix Design
  • Notifications
  • Quality Control

Recent Comments

  • Best SEO Services on Derivation of Area Under Acre to Kanal and Big Marla.
  • Abdul Jaleel P on IRC SPECIFICATIONS, STANDARDS, DESIGN CODES
  • mittal solanki on Different Units Used in Engineering and Revenue Department
  • larks on Determination Of Total Soluble Sulphates In Soils (Volumetric Method)
  • Kavitha on IRC SPECIFICATIONS, STANDARDS, DESIGN CODES

[email protected]

Pinterest Twitter Instagram Facebook
About Us
Copyright Policy
Our Disclaimer
Privacy Policy
Contact Us