22.1 E (ii) (a) (iii)

Furnishing and Placing Reinforced/ Prestressed cement concrete in super- structure as per drawing and Technical Specification RCC/PSC Grade M-40 Using Batching Plant, Transit Mixer and Concrete Pump For Solid slab super-structure- including centering and shuttering Height above 10m