Providing and applying Anti Termite Treatment using post constructional chemical treatment measures as per IS – 6313 – 2001 ( Part 3 ) & using Chemical containg chloropyrifos systemic insecticide diluted to manufacturer’s specifications by drilling holes in the floor slab & along skirting 300 mm apart & 12 mm dia, drilling holes along all possible entry points such as junctions of floor and walls, door frames, sewage lines, entry points , etc. & injecting them with the chemical solution. Note :- The Engineer in Charge will ensure consumption of chemical as per manufacturer’s specifications & minimum 5 years warranty from the concerned dealer.
