Excavation including handling of Rock materials within15 meters inclusive of cost of explosives and dressing compressed air and T&P. Jumper work with occasional blasting.
Excavation including handling of Rock materials within15 meters inclusive of cost of explosives and dressing compressed air and T&P. Jumper work with occasional blasting.