Removal of slips from road side to:- out side road boundary into depressions with combined lead of 15 metres inclusive of cost of of explosive, compressed air T&P.
Removal of slips from road side to:- out side road boundary into depressions with combined lead of 15 metres inclusive of cost of of explosive, compressed air T&P.