33.33(i)

LAYING OF UNDER GROUND CABLES, DISMENTALLING & ERECTION OF POLES AND CEMENT CONCRETE MUFFS: Laying of under ground cable to be laid 1 metre below ground level including excavation, sand cushioning, covering with sand & bricks and back filling the trench etc.