Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including disposal of rubish to the dumping ground within 50 m lead (excluding the cost of scraping of plaster and replastering).
Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including disposal of rubish to the dumping ground within 50 m lead (excluding the cost of scraping of plaster and replastering).