Dismantling of manhole chamber including R.C.C. top slab, C.I. cover with frame including stacking of useful materials near the site including disposal of unserviceable material within 100 m. as desired by Engineer-in-charge. Rectangular manhole 90×150 cm and 120 cm deep
