20.5. c .ii

Adjusting check plates of open flume outlet to correct ‘B’ and fixing at site flush with the gullet walls -Extra over item No. 20.5 (a) in case of existing outlets where dismantling and reconstructing side walls is  invlved including change of  ‘B’ upto 30 mm   H’ more than 0.5m but upto 0.9m