Adjusting check plates of open flume outlet to correct ‘B’ and fixing at site flush with the gullet walls -Extra over item No. 20.5 (a) in case of existing outlets where dismantling and reconstructing side walls is involved including change of ‘B’ upto 30 mm H’ upto 0.5m
