Providing, hoisting and fixing in super structure for first storey precast reinforced cement concrete in small lintels not exceeding 1.5m clear span including the cost of required centring & shuttering, cost of 1:2:4 hand mixed (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal-size) but excluding the cost of steel reinforcement.(Qty of each unit shall not exceed 0.06cum)
