Earth work excavation in ordinary soil, exclusive of compensation of earth ( Note :- For leads beyond 500 metres earth work shall be payable at carriage rates), Hardness, Extra for D.B.D. above 1.8 gm/c.c.
Earth work excavation in ordinary soil, exclusive of compensation of earth ( Note :- For leads beyond 500 metres earth work shall be payable at carriage rates), Hardness, Extra for D.B.D. above 1.8 gm/c.c.