Earth work excavation in ordinary soil, exclusive of compensation of earth ( Note :- For leads beyond 500 metres earth work shall be payable at carriage rates), Hardness, Extra for hard soil with D.B.D. (Dry Bulk Density) from 1.6 to 1.7 gm/c.c.
Earth work excavation in ordinary soil, exclusive of compensation of earth ( Note :- For leads beyond 500 metres earth work shall be payable at carriage rates), Hardness, Extra for hard soil with D.B.D. (Dry Bulk Density) from 1.6 to 1.7 gm/c.c.