5.1.(i).c

Carriage of materials (metalled roads) excluding loading, unloading & stacking Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish. For subsequent chain per chain of 30 metres upto 0.50 km